The only AI-native, SaaS-first ERP engineered specifically for mid-market cement companies (₹100–500 Cr revenue). Go live in 90 days. No consultants. No million-rupee implementation fees.
Most ₹100–500 Cr cement companies run on a dangerous combination of Tally, spreadsheets, and WhatsApp groups. Here's what that costs them.
Sales orders are created but no one tracks the 27-step execution journey from clinker to dispatched bag. Delays are discovered only at month-end.
Reactive coal and iron ore procurement leads to stock-outs and kiln shutdowns. Finance sees the damage only when the month closes.
True cost per tonne is calculated 30 days after the fact. Energy (kcal/kg) and power (kWh/t) overruns go unnoticed until P&L is hit.
BIS compliance documentation done on paper or Excel. 28-day strength test results are manually entered. No audit trail, no systematic hold release.
Kiln shutdowns are discovered, not predicted. MTBF is not tracked. PM schedules live in an engineer's notebook, not in the system.
Dealer credit limits are enforced via phone calls. Overdue AR is chased manually. GST e-invoice is a separate disconnected process.
Titan is a project-centric, AI-powered SaaS ERP where every bag of cement is tracked against a Sales Project ID — from raw material procurement to GST billing.
Traditional ERPs treat a sales order as a record. Titan transforms it into a live project — with 27 sequential activities, SLA clocks, role owners, and auto-escalation rules.
When Activity 14 (Kiln Production Slot) reaches 70% of its SLA, it turns ⚠ Yellow. At 100%, it turns 🔴 Red and auto-escalates to the Plant Head — without anyone needing to remember anything.
Each department gets a purpose-built module with role-specific dashboards, SLA workflows, and AI-driven alerts. Click any module to explore in detail.
Direct TCP integration with weighbridge for tare, gross, and net weight capture. Gate pass auto-generated. E-way bill triggered on exit via GST portal API.
Integrated ModuleWe've benchmarked Titan against every ERP option a cement company would consider. The results speak for themselves.
| Feature / Capability | Titan Cement ERP | SAP Business One | Ramco Cement | Dynamics 365 | ERPNext |
|---|---|---|---|---|---|
| Cement domain knowledge | ✓ Native — OPC 53, BIS, kiln logic | ✗ Generic manufacturing | ✓ Yes — enterprise | ✗ Generic ERP | ✗ No domain knowledge |
| AI / ML Co-Pilot | ✓ 4-layer AI, RAG, NL queries | ~ SAP AI add-on, extra cost | ~ Limited analytics | ~ Copilot available | ✗ No AI features |
| SaaS / Cloud-native | ✓ 100% SaaS, no on-prem | ~ Hybrid, on-prem common | ~ Hybrid deployment | ✓ Cloud-first | ✓ Self-hosted or cloud |
| Database-level tenant isolation | ✓ One DB per tenant | ✗ Shared schema | ~ Varies | ~ Shared schema | ✗ Row-level filtering |
| BIS compliance & LIMS built-in | ✓ Native BIS gate workflow | ~ Configured, not native | ✓ Yes | ~ Requires customisation | ✗ Manual/community build |
| MES / SCADA integration | ✓ OPC-UA / MQTT native | ~ Third-party middleware | ✓ Yes — enterprise | ~ IoT Hub integration | ✗ Not available |
| Mobile-first MES (offline capable) | ✓ Tablet, works offline | ✗ Not available | ~ Limited mobile | ~ Mobile app only | ~ Responsive only |
| GST e-invoice & e-way bill | ✓ Auto-triggered at gate | ✓ Configured | ✓ Yes | ✓ Add-on available | ✓ Community app |
| Planned vs. Actual engine (27 activities) | ✓ Core architecture | ✗ Not available | ~ Basic stage tracking | ✗ Not available | ✗ Not available |
| 16-block no-code configuration wizard | ✓ Self-service, 90-day | ✗ SAP partner required | ✗ Ramco consultants only | ✗ Partner implementation | ~ Manual setup |
| Weighbridge TCP direct integration | ✓ Native TCP/IP | ✗ Manual entry | ✓ Yes | ✗ Custom work | ✗ Not available |
| Predictive maintenance (MTBF tracking) | ✓ Built-in per asset | ~ SAP PM add-on | ~ Limited | ✗ Not available | ✗ Not available |
| India mid-market target | ✓ ₹100–500 Cr | ~ SME, ₹500 Cr+ | ✗ ₹7,500 Cr+ only | ~ Mid-market | ✓ Any size |
| Implementation timeline | 90 Days | 9–12 Months | 18–24 Months | 9–12 Months | 6–10 Months |
| Monthly cost (starter) | ₹25,000/month | ₹2–3 lakh/month | ₹4–8 lakh/month | ₹1.5–2 lakh/month | ₹0 + hosting cost |
*Pricing and features are approximate, based on publicly available data and market estimates. Last updated: Feb 2026.
Scores across 7 critical dimensions (0–10). Titan leads in cement knowledge, AI, speed, and value.
Titan Starter at ₹25K/month vs. ₹1.5L–8L for alternatives. 6–32× cheaper, with superior domain intelligence.
From Sales Order to GST Billing — every step is tracked, timed, and auto-escalated. No manual follow-up required.
Titan's AI doesn't just automate tasks. It actively surfaces decisions, predicts failures, and answers your Plant Head's questions in plain English.
AI guides Company Admin through 16 configuration blocks — setting up company structure, locations, product grades (OPC 53, PPC, PSC), BOM, and SLA parameters. Smart defaults based on industry benchmarks reduce setup time by 60%.
RAG (Retrieval-Augmented Generation) connects the LLM to live plant data — workflow logs, sensor telemetry, LIMS results, and financial records. Ask in plain English: "Which projects are at risk this week?" or "What's our coal consumption vs. plan?"
"Coal consumption rate at Kiln-2 is 748 kcal/kg (target: 720). At current rate, coal stock hits zero on Day 18. Recommend raising Purchase Requisition PR-2847 by 12:00 today to avoid production stoppage."
Tracks MTBF (Mean Time Between Failures) for every motor, bearing, and component in the plant tree. Monte Carlo simulations on active projects forecast SLA breach probability 48 hours ahead — before the activity turns red.
"Kiln Drive Motor #3 has accumulated 4,200 running hours since last maintenance. Historical MTBF: 4,500 hrs. Recommend preventive replacement during next planned shutdown (3 days from now)."
Aggregates P&L, EBITDA, energy costs, and SLA compliance across all plants into a single Group view. Identifies inter-plant efficiency variances — so the CFO knows which plant is dragging down group margins and why.
No open-ended consulting engagements. A fixed, proven rollout methodology that delivers results in 90 days, not 2 years.
Map your plant structure, product grades, BOM, vendor list, and customer hierarchy into the 16-block configuration wizard. Master data cleanup and migration included.
Days 1–30Sales, Finance, and Inventory go live on Production Line 1. End-to-end order-to-invoice cycle tested with your actual orders and your actual team.
Days 31–60MES deployed on Kiln and Mill. SCADA/weighbridge connected. LIMS activated. AI Co-Pilot trained on your plant's historical data. Phase 1 alerts enabled.
Days 61–75All 30 departments fully activated. All 27 activities tracked live. Maintenance module and HR shift governance enabled. Multi-plant BI if applicable.
Days 76–90One monthly subscription covers software, AI, hosting, updates, and support. No per-module fees. No per-user surprises past the plan limit.
Single-plant cement company getting started
No setup fee · 30-day free trial
Multi-plant cement group expanding operations
No setup fee · 30-day free trial
Large cement groups with 5+ plants and custom needs
Custom contract · Private infrastructure